EV Chargers & Panel Upgrades in Shelton
Level 2 EV chargers and panel upgrades in Shelton — permitted through Washington L&I, inspected, and done right the first time.
In Shelton the power comes from Mason PUD 3, not PSE, and Washington L&I runs the electrical permits — two things that shape how a charger or panel job gets done here.
Who issues your permit
Shelton doesn't run its own electrical permit program, so permits and inspections come from Washington L&I.
Your utility: Mason PUD 3
Any panel or service change has to be coordinated with Mason PUD 3.
Rebates and credits (as of October 2026)
PUD 3 lists EV charger rebates tied to its EV charging study, subject to available funds — call PUD 3 to confirm before counting on one. There's no longer a federal tax credit for home chargers.
How we handle it
Every job starts with a load calculation and ends with an inspection. Read how we approach EV charger installs and panel and service upgrades; if solar is on your list too, the same crew can plan it all together.
Common questions
Who issues electrical permits in Shelton?
Washington L&I. Shelton doesn't run its own electrical permit program.
Which utility serves Shelton?
Mason PUD 3.
Are there EV charger rebates in Shelton?
PUD 3 lists EV charger rebates tied to its EV charging study, subject to available funds — call PUD 3 to confirm before counting on one. There's no longer a federal tax credit for home chargers.
Do you install EV chargers and upgrade panels in Shelton?
Yes — Level 2 chargers, hardwired or plug-in, any brand, and panel and service upgrades, with the load calculation, permit and inspection handled. Use the form below or call 360-999-6709.
A written quote. Every time.
Name and phone is all it takes to start. We'll reach out with a real number — no pressure, no obligation.
Here's the price — in writing. Itemized, no surprise line items. It's yours to keep.
Licensed, permitted, inspected. WA electrical contractor MUDBABE765KS · GC MUDBABE743MM.
Rather talk? Call or text 360-999-6709, Mon–Fri 8am–5pm.